Quick answer
A renovation builder usually gets the best result by using a kitchen subcontractor for the cabinetry, while keeping demolition, framing, linings and the trade sequence in-house. The cabinetry maker should measure once the walls are lined and the services are in their final place, build the units off site, and install when the room is ready. Your licensed plumber and electrician do the connections.
Key points
- Subcontract the cabinetry when your crew's time is worth more on structure, linings and finishing than on building or assembling cabinets.
- Keep demolition, making good, the programme and the trade sequence; hand over the measure, manufacture and cabinet install.
- In an existing house, measure after demolition and linings, not off the old kitchen: walls, floors and services rarely match what was there.
- Plumbing and electrical connections stay with licensed trades, booked once to make safe and once to connect.
- Builders send a trade request with no fee; we make standard kitchens and laundries, not full custom builds.
Renovations are where cabinetry plans meet reality. The house is decades old, nothing is square, the old kitchen is hiding a water stain or two, and the owner may be living in the back bedroom. Using a renovation builder kitchen subcontractor for the cabinetry can take a lot of that pressure off your crew, as long as the handover is clear and the sequence is right.
This article is for renovation builders and small contractors replacing kitchens and laundries in existing Auckland houses. It covers when it is worth subcontracting the cabinetry, what to keep yourself, how measuring an old house differs from new work, and how to fit the cabinet install around demolition and the other trades.
If your work is mostly new builds and small fit-outs, our guide to basic fit-out cabinetry for builders covers ordering a multi-room package. This one is about the renovation programme specifically.
When subcontracting the cabinetry makes sense
Plenty of renovation builders can hang a cabinet. The question is whether they should. Building or assembling kitchen units on site takes days your crew could spend on the parts of the job only they can do: structure, linings, weathertightness and finishing.
Subcontracting the kitchen and laundry usually makes sense when:
- Your crew is the bottleneck. If you have more renovation work than people, cabinetry is a clean, separable package to hand out.
- The cabinetry is standard. A straight, L or galley kitchen and a plain laundry are exactly what a cabinetry maker builds every day.
- You want one warranty on the cabinets. A subcontractor who makes and installs the units stands behind both, so a dropped door is their problem, not yours.
- You don't want flat-pack on site. Units delivered assembled go in faster and arrive square, without a pile of cardboard in the hallway.
It makes less sense when the job is a one-off piece of joinery your crew is set up to make, or the cabinetry is so small that coordinating another party costs more time than it saves.
What to hand over and what to keep
The handover works best when the line is clear and written down. On a typical renovation, it falls like this:
| Task | Renovation builder | Cabinetry subcontractor |
|---|---|---|
| Demolition and removal of the old kitchen | Yes, unless agreed otherwise | Not usually |
| Framing, nogs for wall units, linings | Yes | Advises where support is needed |
| Final measure | Makes the room ready | Measures on site |
| Manufacture | No | Builds in the workshop |
| Cabinet install, fillers and panels | No | Installs with its own team |
| Plumbing and electrical connections | Books licensed trades | Leaves the cut-outs |
| Programme, sequence and making good | Yes | Works to your programme |
Agree who removes and disposes of the old units before anyone starts. It sounds minor, but it is a common source of a day lost while everyone waits for the room to be clear.
Measuring an existing house
The biggest difference between renovation and new work is the measure. In a new build, the plans and the house mostly agree. In an existing house, the old kitchen tells you very little about what you will find once it is gone.
- Walls that aren't square or plumb. Common in villas, bungalows and plenty of later houses. Fillers and scribes take up the difference, but they are planned from a measure of the bare wall.
- Floors that aren't level. Adjustable legs handle most of it, and the measure notes where the floor drops.
- Hidden damage. Water damage at the old sink, rot or borer in the floor, and old wiring often only show once the cabinets are out. Our article on the surprises an older Auckland house springs goes through the usual ones.
- Services that move. If the sink, laundry tub or oven is changing position, the final measure has to wait until the new rough-ins are in.
The rule of thumb is simple: price from the plan and a look at the room, measure for manufacture once demolition is done, any repairs are made, the walls are lined and the services are where they will stay.
Sequencing around demolition
A renovation kitchen follows a different order from a new build because there is something to remove first and something to repair after. A sequence that works for most jobs:
- Price from the plan. The subcontractor prices the cabinetry from your plans, the appliance list and a look at the existing room.
- Make safe and remove. Your plumber and electrician disconnect and make safe; the old kitchen and laundry come out.
- Repair and rough in. Fix any damage found, move services where the layout changes and add nogs where wall units will hang.
- Line and measure. Once the walls are lined, the subcontractor does the final measure for manufacture.
- Build off site. While the units are built in the workshop, your crew carries on with painting, flooring or other rooms.
- Install, then connect. The cabinets go in, the benchtop is fitted and your licensed trades come back to connect.
The useful part of this order is the gap between measure and install. Because the cabinets are being built somewhere else, the house isn't sitting idle while they are made.
Working with the plumber, electrician and other trades
Plumbing and electrical connections are for licensed trades. Your plumber connects the sink, tub, taps, waste and dishwasher; your electrician wires the oven, cooktop, rangehood and any new circuits. Our article on who connects the sink sets out where the cabinetry crew's work stops.
Book both trades twice: once to disconnect and make safe before demolition, and once to connect after the cabinets and benchtop are in. Tiling and splashbacks follow the benchtop, and painting is easiest done before the cabinets arrive, with a touch-up after.
Flooring needs an early decision: does the new floor run under the cabinets or stop at the kickboard? Either can work, but it changes the cabinet height and the order of trades. For more on sequencing the install around rough-ins, flooring and benchtops, see our piece on coordinating the kitchen install with other trades.
Occupied houses and tenanted rentals
Many renovations happen with someone living in the house. The more the cabinetry can be built off site, the fewer days the owner or tenant goes without a working kitchen or laundry.
For tenanted rentals, the landlord needs to follow the tenancy rules on notice and access, and should check the current requirements with Tenancy Services. Plan the laundry and kitchen so they aren't out of action at the same time if you can, and agree a temporary arrangement for cooking and washing with the occupants before demolition starts.
Whether a renovation needs a building consent depends on what is being changed, especially if walls, structure or drainage are involved. Check with Auckland Council or building.govt.nz before work starts; a like-for-like cabinet replacement and a layout change can be treated very differently.
When the job is bigger than standard
We make standard kitchens and laundries, as well as vanities and wardrobes, in our standard layouts and finishes, built from 18 mm moisture-resistant board in Laminex Melteca with soft-close hardware and a 10-year cabinetry warranty. We don't take on full custom builds.
If a renovation includes a designer kitchen with bespoke detailing, heritage matching or architectural joinery, a specialist custom maker will suit you better, and we'll say so when we see the plans. If the kitchen is custom but the laundry, vanities and wardrobes are plain, tell us, and we'll be straight about which parts we would price.
A renovation goes smoothly when every trade knows exactly where its job starts and stops.
Getting the kitchen and laundry priced
Builders send a trade request with the plans, photos of the existing rooms, the appliance list and your rough programme. There is no fee for trade work. We price the cabinetry, then measure on site once the room is ready, and install with our own team.
Frequently asked questions
Should a renovation builder subcontract the kitchen?
Often, yes, when the cabinetry is standard and your crew's time is better spent on structure, linings and finishing. A subcontractor who makes and installs the cabinets also stands behind them under its own warranty.
When should cabinets be measured on a renovation?
After demolition, after any repairs, once the walls are lined and the services are in their final position. Measuring around the old kitchen is unreliable in an existing house.
Who removes the old kitchen?
Usually the renovation builder, after the plumber and electrician have made it safe. Agree it in writing before the job starts so nobody waits on it.
Can you install around tenants or owners living in the house?
Yes. Because the cabinets are built off site and delivered assembled, the room is out of action for less time. Landlords should check notice and access rules with Tenancy Services.
Do builders pay for the measure?
No. Builders and developers send a trade request with no fee. The free measure & quote is for homeowners when we visit the property.
Send us your next renovation
Builders can send a trade request for the kitchen and laundry on their next renovation. If you are a homeowner managing your own renovation, bring photos and measurements to our East Tāmaki shop for a free quote, or book a free measure & quote, GST included: we measure on site and send a detailed quote.