Matching Wardrobes Across Every Bedroom in a New Build

By the MTN Kitchens workshop team · East Tamaki, Auckland · 2026-11-26 · 8 min read

23+ years' trade experience · 2,000+ kitchens supplied & installed across Auckland · Laminex NZ fabricator

For builders: set one wardrobe spec per bedroom type, sort handing early, install after paint, and keep every bedroom matched with standard wardrobes.

Quick answer

The simplest way to do wardrobes for new builds is to write one standard wardrobe spec for each bedroom type, decide the handing from the door swing and light switch before anyone measures, and install the wardrobes after the painters have finished. Standard wardrobes in standard layouts and finishes keep every bedroom matched, make the order easy to check and keep the wardrobe line off your critical path.

Key points

  • Treat the wardrobes as their own line on the job, not an afterthought at the end of the kitchen order.
  • Set one spec per bedroom type: the same carcass, internals, doors and handles every time that room type repeats.
  • Decide handing early, from the bedroom door swing and the light switch, so the hanging side is never behind the door.
  • Install after paint, and agree with the flooring layer whether carpet goes in before or after.
  • Standard wardrobes keep a build simple. MTN makes standard layouts and finishes for builders and doesn't take full custom builds.
  • Builders send a trade request with no call-out fee.

On most new builds the kitchen gets the attention and the wardrobes get squeezed in at the end. Then three bedrooms end up with three slightly different wardrobes, one door hits the light switch, and the painter has to come back to cut in around joinery that went in too early. None of that is hard to avoid if the wardrobe line is planned from the start.

This guide is about wardrobes for new builds, written for builders and small developers doing townhouses, standalone homes and basic fit-outs. It covers how to spec them by bedroom type, how to handle handing, what to ask the framer for, and where wardrobes fit in the install order. If you want the whole cabinetry order across kitchen, laundry, vanities and garage, our guide to basic fit-out cabinetry for builders covers that.

Why wardrobes are worth a plan of their own

Wardrobes look simple, and individually they are. The trouble comes from repetition. A house might have three or four bedrooms, a townhouse development many more, and every one is a chance for a small difference: a shelf at a different height, a handle from a different batch, a door that opens the wrong way.

Buyers and tenants notice those differences, even if they couldn't tell you why one room feels less finished than the next. Inspectors and property managers notice them at handover. A clear wardrobe plan means every bedroom of the same type looks and works the same, and the order can be checked against one sheet instead of a stack of one-offs.

One wardrobe spec per bedroom type

Start by grouping the bedrooms, not by numbering them. Most builds have two or three bedroom types: a main bedroom, standard bedrooms, and sometimes a small single room or study. Each type gets one wardrobe spec, and that spec repeats every time the room type repeats.

A spec covers the carcass, the internals, the doors, the handles and the finish. Keep the internals plain and useful: a shelf over hanging, a section of double hanging where the width allows, and a drawer bank in the main bedroom if the budget does. For how the inside of a wardrobe is usually split up, our piece on how wardrobe internals are divided is a good primer, though its older pricing doesn't apply to MTN today.

A simple wardrobe spec sheet
ItemMain bedroomStandard bedroomSmall bedroom or study
WidthFull wall or alcove, as framedStandard alcove, as framedNarrow alcove, as framed
InternalsHanging, double hanging and a drawer bankShelf over hanging, some double hangingShelf over hanging, or shelves only
DoorsHinged or sliding, one finishSame finish as the mainSame finish as the main
HandlesOne handle across the houseSame handleSame handle
FinishLaminex Melteca, matched to the kitchenSameSame

One finish and one handle across every bedroom is the single biggest step towards a build that looks consistent. If the kitchen and laundry are in Laminex Melteca, the wardrobes can match exactly, which ties the whole house together without any extra design work.

Handing: which side the hinges and hanging go

Handing is the same idea you see on terrace kitchens, which our article on handed kitchens in terrace townhouses explains: one design, built left-handed or right-handed to suit the room. For wardrobes it decides which way the doors open and which side the hanging and the shelves sit.

The rule of thumb is simple. Stand in the bedroom doorway and look at where the door swings and where the light switch is. The wardrobe door nearest the bedroom door shouldn't open into it or cover the switch, and the side you use most, usually the hanging, should be the side you reach first.

  • Check the bedroom door swing. A wardrobe door that clashes with the room door is the most common handing mistake.
  • Check the switch and power points. Hinged doors shouldn't cover a switch when open.
  • Mark the handing on the plan. Write left or right for each wardrobe so the workshop and the installers read the same thing.
  • Mirror units mirror wardrobes too. In handed townhouses, the wardrobes usually flip with the rest of the unit.

Framing and linings that make wardrobes easy

A wardrobe is only as square as the alcove it goes into. Framing that is plumb and square, with linings fitted straight, lets a standard wardrobe slide into place with a neat scribe. An alcove that tapers or leans means fillers, packing and a finish that never looks quite right.

A few things to agree with your framer and your plasterer before the walls are closed in:

  • Consistent alcove sizes. If the plans show the same wardrobe in three bedrooms, frame all three to the same opening.
  • Solid fixing. Nogs or dwangs where the wardrobe and any shelving fix to the wall, so nothing hangs off plasterboard alone.
  • Clear the wardrobe walls. Keep power points, switches and services out of the wardrobe space unless they're planned there.
  • Linings and architraves decided. Know whether the wardrobe sits inside a lined alcove or finishes to the wall, so the measure is taken off the right surface.

Measuring the wardrobes on site

We measure wardrobes once the linings are on and the alcoves are final, so we're measuring the space the wardrobe actually goes into rather than a drawing. Each bedroom type is checked against the spec sheet, and any alcove that doesn't match its type is flagged before anything is built.

That check is where standard wardrobes pay off. If three standard bedrooms are framed the same, they get three identical wardrobes built in our East Tāmaki workshop in one run. If one alcove is out, we can see it at the measure and agree what to do, rather than finding out on install day.

Install order: after paint, before handover

Wardrobes are finishing work. The cleanest sequence is to let the plasterer and painter finish the bedrooms first, then install the wardrobes into painted alcoves. The painter doesn't have to cut in around joinery, the wardrobes don't get paint on them, and the alcove walls behind the doors are already done.

Where wardrobes usually fit in the sequence
StageWhat happensWardrobe step
FramingAlcoves framed, nogs inCheck alcove sizes against the spec
LiningsPlasterboard and linings fittedSite measure
PaintBedrooms paintedWardrobes built in the workshop
FlooringCarpet or hard flooring laidInstall before or after, as agreed
Fit-offFinal trades, cleanDoors adjusted, handles checked

Carpet is the one to agree early. Some builders like wardrobes in before carpet so the carpet layer can finish neatly to the wardrobe base. Others prefer the carpet down first. Either works if it's decided before the programme is set, so the flooring layer and our install team aren't both expecting to go first.

Why standard wardrobes keep a build simple

For new builds, MTN makes standard kitchens, laundries, vanities and wardrobes in our standard layouts and finishes. We don't take full custom builds, and we're open about that. What we offer builders is a wardrobe line that is predictable: the same spec repeated, built in our workshop, delivered assembled, not flat-pack, and fitted by our own install team.

Standard wardrobes keep the decisions small. There's one spec sheet per bedroom type, one finish and one handle, so ordering, checking and fixing anything later is straightforward. They're built from 18 mm moisture-resistant board with soft-close hardware and carry our 10-year cabinetry warranty.

On a build, the best wardrobe is the one nobody has to think about twice.

If your client wants a showpiece walk-in with bespoke detailing, that's a different job and not one we take on for builds. For standard bedrooms done well and done the same, our approach fits.

Sending a trade request

Builders and developers don't pay for a measure. Send a trade request with the plans, the bedroom types and your spec sheet if you have one, and we'll come back to you with a price for the wardrobes, or the whole fit-out if you want kitchen, laundry and vanities in the same order. For larger multi-unit work, see our page for developers.

Frequently asked questions

When should wardrobes be installed in a new build?

Usually after the bedrooms are painted and before final fit-off. That keeps paint off the joinery and saves the painter cutting in around it.

Should wardrobes go in before or after carpet?

Either can work. Agree it with your flooring layer before the programme is set, so the carpet finishes neatly and nobody is waiting on anyone else.

Do all the wardrobes in a build have to be the same?

No, but every bedroom of the same type should be. One spec per bedroom type, with one finish and one handle across the house, keeps it consistent.

What does handing mean for wardrobes?

It means building the same wardrobe left-handed or right-handed so the doors and the hanging side suit the room. Decide it from the bedroom door swing and the light switch.

Do builders pay for a measure?

No. Builders and developers send a trade request with no call-out fee, and the free measure & quote is only for homeowners when we visit a property.

Does MTN do custom wardrobes for new builds?

For builds we make standard wardrobes in our standard layouts and finishes, and we don't take full custom builds. That keeps every bedroom matched and the order simple.